Close

Building

Bonnington Road Facade Unwrapped

Bonnington Road Facade Unwrapped image
Bonnington Road, Edinburgh

Scaffolding has now been dismantled and thanks to new drone footage, we can finally see the impressive brickwork frontage and full scale of our site at Bonnington Road in Edinburgh.

GRAHAM is on schedule to deliver 464 homes this Summer on behalf of PLATFORM_ and Heimstaden. 114 of these will be much-needed affordable units.

At 6 storeys high, the development fits in well with the surrounding architecture and is spread across three residential blocks totalling 325,000 sq.ft.

The residents’ experience has been prioritised at the build-to-rent (BTR) development and will include a fully equipped gym with yoga room and spin studio, cinema room, private dining room and open plan co-working space for. The rooftop terraces overlooking the Water of Leith have been thoughtfully designed to provide residents with sociable outdoor space.

The local area has many bars and restaurants and excellent public transport links to the city centre.

Sustainability has been important to the project which includes electric vehicle charging points, mechanical ventilation heat recovery (MVHR) units and roof mounted solar panels for on-site power generation.

The project is due to complete in Summer 2024.